Thanks for taking the time Monday to meet for the pre-drywall meeting.
We were able to get the home rewired and the gas line that was cut out
replaced. We have the rough inspections called in and just waiting on
the inspector. The drywall was stocked today. Next week we will
insulate, get an insulation inspection and should be in drywall mid
week. The siding will be started next week also.